With high expectations in 2019, construction begins on the final disposal lagoon that will receive the treated industrial effluents from the fishing industries of the city of Rawson and its port of the same name. The treatment system is made up of an anaerobic lagoon, two aerobic basins with forced aeration through surface aerators, and a pond for final disposal and reuses in irrigation.