Every three months, the 16 engines that carry out the aerobic treatment of effluents are stopped to carry out maintenance tasks. The floating stainless steel structures are cleaned and the motors that run 24 hours a day throughout the year are greased. If any of them are in failure, they are removed with a crane for bearing changes or shaft rectification at the Torres Electricity workshop.